Sheet A-200PracticeFour kinds of work, six phasesMon to Fri, 9 AM to 6 PM

What we do, and how.

Homes, interiors, shops and old buildings looking for a new use. Different scales, one way of working: measure first, say plainly what is possible, then stay with it until the contractor leaves.

01Largest share

Residential renovation

Two-flats converted into one house, greystones with new kitchens and baths, workers’ cottages that need a rear addition, bungalows that need light. We keep the street side as the neighbors know it and put the new work where it does the most good.

  • Whole-house renovation
  • Rear and rooftop additions
  • Two-flat deconversions
  • Coach houses
AXONOMETRIC NTS
02With or without a renovation

Interiors

Kitchens, baths, built-in cabinets, stairs, finishes and lighting. Elise Marchetti leads this work, inside our own projects or on its own, and draws the millwork herself so the shop builds exactly what was agreed.

  • Kitchens and baths
  • Millwork and built-ins
  • Finish and fixture schedules
  • Lighting plans
ISLAND KITCHEN PLAN 1:50
03Shops, food, clinics, offices

Small commercial

Bakeries, small shops, clinics and offices, usually in a storefront with history. We can look at a space before you sign the lease, tell you what the city will ask for, and get you open with as few surprises as the building allows.

  • Pre-lease reviews
  • Storefront restoration
  • Food service fit-outs
  • Accessibility upgrades
BAKERY STOREFRONT ELEVATION 1:50
04Old masonry, new use

Adaptive reuse

Stables, print shops, freight houses and a firehouse. We start with what the building already does well (thick walls, big openings, tall rooms) and fit the new use around it, with zoning and code worked out before anyone draws a finish.

  • Change of use and zoning
  • Existing conditions surveys
  • Masonry and structure with engineers
  • Homes, offices, workshops
NORTH ELEVATION 1:100

Building types

The buildings we know best.

Most of Chicago’s neighborhoods were built from a handful of types between 1880 and 1930. We have worked in every one of these.

Swipe to see all six

WORKERS' COTTAGE TWO-FLAT GREYSTONE BUNGALOW STOREFRONT WAREHOUSE LOFT

Process

Six phases. You can stop after any of them.

Each phase ends with a meeting and a clear set of drawings. Nothing moves on until you say so.

  1. 01

    Feasibility

    We measure the building, check zoning, landmarks and code, and test your idea against the budget. You get a short report with plans of what is there and a plain answer.

    2 to 3 weeks / fixed fee

  2. 02

    Schematic design

    Two or three directions as simple plans and massing, each with a rough cost. You pick one, or the best parts of two.

    4 to 6 weeks

  3. 03

    Design development

    Windows, stairs, structure, systems and finishes get decided. Interiors begin here, and a contractor can give a better number.

    4 to 8 weeks

  4. 04

    Construction documents

    The full drawing set and details, coordinated with structural and MEP engineers, ready for the city and for bids.

    6 to 10 weeks

  5. 05

    Permit and bidding

    We file, answer the reviewers’ comments, and help you compare two or three contractor bids line by line.

    Depends on the city’s review

  6. 06

    Construction administration

    Regular site visits, answers to the contractor’s questions, review of pay requests and a punch list at the end. A licensed architect from the studio is on every job.

    For the length of the build

Fees

How fees work.

Phase 01

Feasibility

A fixed fee, agreed after a first call, credited toward design if you go ahead.

Phases 02 to 05

Design and permit

A fixed fee per phase, written down before each one starts.

Phase 06

During construction

Hourly, with a ceiling we agree on, so the build never carries an open tab.

Start with phase one.